Compulsory Purchase Order documents

Name
Cotswolds VIP - Statement of Reasons
NGET (Cotswolds VIP) CPO 2025 - Crown Land Maps
NGET (Cotswolds VIP) CPO 2025 - Land Maps
NGET (Cotswolds VIP) CPO 2025 - Order and Schedule
NGET (Cotswolds VIP) CPO 2025 - Special Category Land Maps
Accent - Visual Impact Project Acceptability (Acceptability Testing Report 2018)
Dalcour Maclaren - Cotswolds VIP Information Plans (Drawing numbers 21006866_PLN_INFO_27.1 and 21006866_PLN_INFO_27.2)
Dalcour Maclaren - Cotswolds VIP Information Plans (Drawing numbers 21006866_PLN_INFO_27.1 and 21006866_PLN_INFO_26.2)
Eftec - VIP Acceptability Testing, North Wessex Downs Technical Report (Acceptability Testing Report 2022)
NGET Electricity Transmission Licence - Special Conditions
National Grid - Annex A6.04 – Willingness to pay report, December 2019
Consumer Willingness to Pay research, June 2012
Guidance on Land Rights for New Electricity Transmission Assets (England and Wales) (GLR)
Visual Impact Provision - How we intend to reduce the visual impact of existing electricity transmission lines in National Parks and Areas of Outstanding Natural Beauty
Visual Impact Provision - Landscape and visual impact assessment of existing electricity transmission infrastructure in nationally protected landscapes in England and Wales (LVIP Technical Report)
Visual Impact Provision - Landscape and Visual Impact Methodology (LVIM)
Ofgem - Strategy for the next transmission price control, RIIO-T1 outputs and incentives
12508-Cotswolds VIP-LVA-Final Report-290524_Part1 (3)
12508-Cotswolds VIP-LVA-Final Report-290524_Part2 (2)
12508-Cotswolds VIP-LVA-Final Report-290524_Part3 (2)

Cotswolds VIP information map (July 2023)

These maps show the current preferred temporary access, pylons to be removed and retained, preferred temporary construction compound, preferred sealing end compound location and preferred cable route as of July 2023.

VIP Project Seventh Annual Report

The latest Visual Impact Provision (VIP) Annual Report is now available to download.

The seventh annual report for the Visual Impact Provision (VIP) project covers the activities that we have undertaken over the last year, our engagement work with a wide range of stakeholders and an overview of each of the four prioritised projects.

In Dorset, our site team are making great progress with construction as well as integrating themselves in the local community, showing ingenuity and the highest standards of engineering excellence to adapt to the surrounding environment.

Construction began in the Peak District in May 2021 and our Snowdonia project now has the planning consents it needs in place.

Work is well underway to develop the planning application and Ofgem submission for North Wessex Downs, and we are working with local experts to identify the best opportunities for biodiversity net gain.

The report documents progress of the VIP project from June 2020 to May 2021. You can download a copy of the report in English here, and in Welsh here.

We hope you will enjoy reading our annual report. If you have any questions, please do not hesitate to email the project’s community relations team at [email protected]..