Fixed Storage Charges - 2011/12

Charges applicable to the 2011/12 Annual Storage Invitation:

Commodity Charges

Facility Storage Injection (p/kWh) Storage Withdrawal (p/kWh)

Avonmouth

0.445

0.033

 

Tanker Filling Charges

Annual Tanker Filling Slot

£8,328 per annum

Storage Withdrawal

£606 per tanker

 

Carry Over Charges for Uncovered Gas in Store

Carry Over Month Charge (p/kWh/day)
May

0.0000

June

0.0002

July

0.0006

August

0.0012

September

0.0048

October

Mandatory Withdrawals Apply

 

Injection Overrun Cap

Overrun Month Charge (p/kWh)
May

0.0000

June

0.0100

July

0.0170

August

0.0100

September

0.0100

October to April

0.0000

 

Permitted Deliverability Overrun Charges

Overrun Month Charge (p/kWh)
June, July, August, September

0.0875

April, May, October, November

0.1825

December, January, February, March

0.3650

 

Withdrawal Standby States and Charges

 

Site State Lead Time Cost per day

Avonmouth

1

1 hr

n/a

 

2

2 hrs

£2000

 

Normal

6 hrs

£0

Standby Conditions:

a) system demand is greater than 80% of estimated peak demand, or

b) "bid to buy prices" for the Day are equal to the average summer gas price plus the injection commodity price plus the clearing price for the facility minus 0.1 p/kWh

and at other times at the discretion of LNG Storage

Notes:

State 1: Typically when a site is withdrawing gas

State 2: When a site is at a shortened withdrawal lead-time, but not withdrawing gas

Normal: Where a site is not at a state ready for withdrawing gas

For the avoidance of doubt a User will not be able to request that a particular facility be moved to a lead time of 1 hour ("State 1") as a facility will only move to that state when it is already flowing.

 

"Minimum" Regulated Charges 2011/12

(pursuant to Standard Special Condition C3)

Facility Reserved Space (p/kWh/a) Reserved Deliverability (p/kWh/a)

Avonmouth

3.593

3.304

 

Note: These charges only apply to capacity booked by NGG for Operating Margins and SGN in respect of the SINs.